Molalla River School District
C
Clarkes Elementary School
M
Molalla Elementary School
Molalla High School
Molalla River Middle School
Mulino Elementary School
R
Rural Dell Elementary School
View Original
Spanish
Cantonese
French
German
Italian
Tagalog
Vietnamese
Korean
Russian
Hindi
Guest
|
Login
{1}
##LOC[OK]##
Home
About MRSD
We Believe...
Priorities, Goals and Initiatives
Board of Directors
Board Members
Board Policies
FAQs
Meetings
Board Policies
The District
Contact Us
Site map
Non-Discrimination Notice
Accessibility Notice
2022-2023 Division 22 Standards Compliance
District Continuous Improvement Plan 2019-2022
MRSD Covid 19 Management Plans
Initial SIA Application 2019-2020
MRSD Student Investment Account Annual Report for the 21-22 School Year
MRSD Student Investment Account Annual Report for the 22-23 School Year
Archived District Updates
Academics
Teaching and Learning
Assessments
Instructional Standards
Programs
Title I
English Language Learners
TAG
Supported Education
Science, Technology, Engineering and Mathematics (STEM)
District and School Report Cards
Schools
Elementary Schools
Clarkes Website
Molalla Website
Mulino Website
Rural Dell Website
Middle School
MRMS Website
High School
MHS Website
Charter Schools
Parents
Rights and Responsibilities Handbook
Safety
About
Alert System
Resources
Safe Oregon
Volunteer and Training Information
Instructional Standards
Board Meetings
Nutrition
Transfer Requests
Staff Directory
State Testing 23-24 Annual Notice
Calendars
Health
Health Standards
K-12 Comprehensive Sexuality Education Plan
Oregon Law / Erin’s Law
Enrollment/Annual Verification
Online Registration
Annual Student Verification Information
ParentVUE/StudentVUE
Transfer Requests
Kindergarten Registration for 2024-2025
2024 Kindergarten Camp
Inscripciones de Kindergarten
Departments
Welcome Back
Athletics
High School Athletics
Business & Finance
Purchase Order Terms and Conditions
MRSD Budget Information
Teaching and Learning
District Improvement Plans
Initial SIA Application 2019-2020
Common Core Standards
Statewide Testing
K-12 Comprehensive Sexuality Education Plan
Facilities Management
MRSD Safe Schools and Testing Plans/Results
Completed Repair and Routine Maintenance Projects
Long-Range Facility Planning
Long Range Planning Committee Full Report
Food & Nutrition
Free and Reduced Lunch Program
Mealtime Online
Menus and Pricing
Parent and Student Resources
Upcoming Guidelines for Oregon
Human Resources
Employment
AESOP
I Visions Portal
Resource & Trainings
Licensed Agreement
Classified Agreement
Teachers Standards and Practices Commission
Teacher Performance Rubric
Office of the Superintendent
Election Measure 3-606: Bonds to replace Molalla River Middle
School Counseling
School Health Services
Medication Administration
Immunization Information
Communicable Disease & Excludable Illness
Individual School Health Protocols
Community Resources
Health Screenings
Staff Resources
Lead Information
Weekly Wellness Resources
MRSD Response to Student Risk of Suicide
Oregon Law / Erin’s Law
Supported Education
About Us
Free Appropriate Education (FAPE)
Supporting Agencies & Partners
Student Services Staff Directory
Transportation Services
Contact Us
Clackamas County School Map
Bus Schedule
Parent and Student Resources
Technology Services
Molalla Transition Program
Community
Alumni
Local Government
Volunteer
MREF
MRSD Board Resolution
Skip Sidebar Navigation
About MRSD
Academics
Schools
Parents
Enrollment/Annual Verification
Departments
Facilities Management
MRSD Safe Schools and Testing Plans/Results
Completed Repair and Routine Maintenance Projects
Long-Range Facility Planning
Long Range Planning Committee Full Report
Community
Last item for navigation
Molalla River School District
»
Departments
»
Facilities Management
»
Completed Repair and Routine Maintenance Projects
Completed Repair and Routine Maintenance Projects
The Molalla River Board of Education has identified maintaining responsible stewardship of all public resources as one of their top priorities. The district is committed to this endeavor and has focused it's efforts in capital projects, repairs and routine maintenance across all facilities. Below is a list of completed projects over the last 18 months.
School
Completed Projects
Clarkes
Elementary
Installed AED machine and cabinet
Fixed roof leak in the ball room
Fixed roof leak between rooms 5 and 6
Tightened hand holds on rock wall on playground
Installed new lighting in Patty Ross’ room
Fixed drain in room 7
Generator put to use and worked!
Replaced boiler nozzles and filters
Re-graded and leveled the parking lot
Repaired motor and replaced belt on gym HVAC unit
Changed flush valves on toilets
New controller on boiler
Replaced some plumbing on boiler
Repaired ignition system on boiler
Repaired flashing on outside of the gym
Repaired toilet in staff room
Cleared area for greenhouse
Fixed roof leak in entryway
Treated/stained wood climbing structure on playground
Replaced pressure tanks
Replaced carpet in room 4
Molalla
Elementary
Installed new parking signs for Marianne
Repaired major water leak in Room 17
Pulled up old carpet and replaced it in Rooms 16-21 and entire pod
Replaced ballasts in room 7
Repaired dishwasher (Bach Bros)
Repaired garbage disposal (Kleen Solutions)
Repaired hot box #1
Installed AED machine
Helped with new walking path
Changed parking lot lights with help from MCC
Electronic reader board sign is up and running!
Installed emergency lighting in all pods
Created new learning space for Speech and Language Specialist in a pod
Adjusted gym doors
Rebuilt sewage pump and installed (American On Site)
Replaced pressure relief valve on boiler B
Replaced lights in gym
Regarded gravel parking area
Fixed numerous roof leaks
Alarm pull cover installed
New downspout installed
Rerouted some pipes on each boiler
Replaced low water cutoff valves on each boiler
Repaired water leak in library
Installed fitness stations around walking track
Repaired phone conduit on roof
Replaced faulty exit signs
Added battery backup ballast for hallway lights
Replaced pump bearing assemblies for each boiler
Replaced transducers for Climatech
New pre rinse hose installed in the kitchen
Mulino
Elementary
Fixed computer lab electrical issues
Got rid of ants in kitchen
Replaced ballasts in gym and rooms 1,3,4,5,6
Fixed roof leaks
Installed new ceiling fan in the office
ODOT to fix drainage issues at flag pole (Houck Construction)
New motor starter installed in AHU for cafeteria
Replaced air vent valve over cafeteria
Installed AED machine
Hung plaque near office
Cleaned carpet in Ms. Lowe’s room and completed air quality testing
Installed new thermostat in the library
Replaced motor coupling for gym AHU
Repaired floor scrubbers
Took out carpet in computer lab and coated VCT tile
New controller installed for library heat
Replaced RTU 8
Installed partitions in Room 33
Replaced motor in AHU for the cafeteria
Rural Dell Elementary
Moss removal on sidewalk between the buildings
Repaired crash bar on door by the office
Replaced ballasts in rooms 1 and 2 and a bathroom
Installed and using new water treatment system (daily testing for 3 months)
Fixed handicap button for main door
Repaired roof leak above room 1
Installed AED machine
Fixed roof leaks in cafeteria
Painted and replaced ceiling tiles in cafeteria and gym
Adjusted the stage lighting
Replaced light bulbs in gym
Unclogged drain in the kitchen
Installed new ridge cap on the roof
Replaced board for teeter totters and painted the seats (playground equipment)
Regarded parking lot
Repaired floor scrubbers
Perform weekly water testing
Reroofed parts of north building
Repaired roof leaks on the gym
Trimmed large oak tree on playground
Removed 4 trees (rotten=safety hazard)
Replaced photo cells
Fixed drinking fountain in the hallway
Replaced pressure tanks
Molalla River
Middle School
Fixed outlets in room 20
Fixed locking mechanism on North Gym Door (doors and latches to be replaced soon)
Fixed oven in kitchen
Fixed a leak in the fire control water valve
Changed light bulbs various areas
OR Window Installers fixed windows in rooms 11 and 27
Fixed outlet by the men’s restroom in office
Fixed hose bib outside by boiler room
Fixed many HVAC issues
Repaired lights in 8
th
grade hall
Fixed room 11 intercom
Cut new access hatches for HVAC accessibility
Fixed band room HVAC issues
Adjusted beam detector in gym to solve locker room alarm issues
Replaced pressure relief valves on boilers
Painted North and South gyms
Fixed roof leaks on North and South gyms
Replaced fuses on North and south gyms RTUs and adjusted thermostats
Cleaned out warehouse
Fixed parking lot potholes
Cleaned and repaired gutters
Repaired RTU on 6
th
grade wing
Put moss killer on roof
Bought new carpet extractor
Repaired both hot boxes in kitchen
Repaired and maintaining freezer issues in kitchen
Added receptacles in room 15
Cut in new roof hatches for better access
Repaved center courtyard
Installed new catch basin in courtyard
Cleaned out t-buildings
Completed fire marshal list
Replaced AHU above Room 17
Installed new LED light outside North Gym
Rebuilt 3 steam traps
Rebuilt condensate pumps
Replaced thermostats in North gym
Replaced low water cutoff on both boilers
Molalla High
School
Fixed cooler and freezer (Brian Mays)
Replaced booster heater for dishwasher in kitchen (NCC)
Moved music equipment for concert from MS to HS and back
Fixed exit sign in gym
Fixed OOI classroom window leak
Fixed lights and ballasts in choir room
Replaced hinges on cooler
Replaced thermostats in weight room and girls locker room
Replaced heating water pump expansion joint in new wing
Replaced parking lot lights and a ballast
Installed new burners and ignition modules for RTUs 6 and 9
Fixed roof leaks
Fixed exhaust fan leak in custodial room
Unplugged drains in the kitchen and staff bathroom (in house and Roto Rooter)
Fixed dishwasher in kitchen
Fixed flooring in the crow’s nest at the soccer field
Repaired hot boxes in kitchen
Replaced pump for kitchen hot water unit
Replaced generator steamer (boiler)
Replaced convection steamer
Fixed heating strip around freezer door
Completed fire marshal list
Replaced bulbs in soccer scoreboard
Replaced parking lot light ballasts
Replaced 2 outside lights with LED fixtures
Rebuilt shop air compressor
Rebuilt gym air compressor
Replaced igniters, ignition module on RTUs 1 and 5
Replaced expansion joint of fire sprinkler risers
Replaced bathroom exhaust fan
Replaced metal shop exhaust fan motor
Replaced flow switches on boilers
Land Lab and
Heckard Field
Replaced thermostats in main building
Repaired HVAC unit
Cleaned sewage pit
Repaired bulbs in shop
Rewired Ag Barn
Repaired large crack in tennis court 1 (continued monitoring)
Repaired HVAC at locker rooms
Painted dugout stripes at the baseball field
Fixed the neighbors fence bordering the field
Pruned trees on neighboring fence line
Rocked around the base of the batting cages
Fixed light inside batting cages
Painted rollup doors on track shed and windows at concession stand
Locker room was painted (coordinated community effort and professional painters)
Installed new photo cell for flag pole light
Cleaned out under stadium
Replaced panic hardware on locker room doors
Replaced exhaust fan motors in the Locker rooms
District Office
and Shops
Fixed broken downspout at PE Gym
Fixed gutter on PE gym
Fixed broken motor pool gutter
Pruned hedge by motor pool
Had grounds roller rebuilt (JD Peterkin)
Other District Property
Cleaned out Schuebel (recently sold)
Prepared Marquam Property for sale (sheetrock, roofing maintenance, painting, brush work, etc.)
Fixed gate/entrance to Buckner Creek Property and cleaned up garbage dump area